Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

December 25, 2023

March 24, 2024

750 Chase Pkwy

Renovation

No Information to Display

$1,000,000.00

Public - State/Provincial

img_map_placeholder

750 Chase Pkwy, Waterbury, CT

Subscribe to View Full Documents

The awarding authority reserves the right to waive technical defects or to reject any and all bids. CONTRACTOR'S INSURANCE: Requirements for insurance coverage for the successful bidder are as outlined in THE GENERAL CONDITIONS OF THE CONTRACT. Certificates of coverage for the required insurance shall be submitted to the CSCU prior to commencing the Work. Question Deadline 10/18/2023 Questions may be addressed to: Engineer: Scott Waitkus, Principal BVH Integrated Services, a SALAS O'BRIEN company 206 West Newberry Road, Bloomfield, CT 06002 scott.waitkus@salasobrien.com CSCU Rep: Steven Longo, Director Facilities, Planning & Engineering Connecticut State Colleges & Universities (CSCU) 61 Woodland Street, Hartford, CT slongo@commnet.edu College Rep: Christopher Pronovost, Maintenance Supervisor CT State Community College Naugatuck Valley 750 Chase Parkway, Waterbury, CT CPronovost@nvcc.commnet.edu The work of this contract includes, but is not limited to the following: o Removal and replacement of the existing buried condenser water piping between the existing Central Utility Plant (CUP) and Cooling Towers. o Removal and replacement of above ground piping below the Cooling Towers. o Pipe connections and modifications within the CUP pump pit. o Modifications to existing Cooling Tower electrical feeds and control wiring, and controls. o New automated valves and flex connectors at the Cooling Towers. o Associated site work, concrete pads, and site restoration. Note: The Authorities Having Jurisdiction (AHJ) for Threshold Projects, Non-Threshold Projects, and/or Connecticut State Colleges & Universities (CSCU) construction projects, as defined by the Connecticut General Statutes, are the Connecticut Department of Administrative Services (DAS) / Construction Services (CS), Office of State Building Inspector (OSBI) and Office of State Fire Marshal (OSFM)

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.