Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 17, 2023

March 18, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$25,775,000.00

Public - City

img_map_placeholder

Multiple Locations, Phoenix, AZ

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

PROCUREPHX PRODUCT CATEGORY CODE 912000000 The City of Phoenix is seeking a qualified contractor to provide preconstruction services and complete construction services for the 48-inch Scenario 3B Transmission Main Rehabilitation Construction Manager at Risk (CMAR) project. This project consists of two separate segments identified as Segment 1 and Segment 4 with a combined approximate total of 10,800 linear feet. The Segment 1 alignment is from Orangewood Avenue and 20th Street, traversing under SR-51 to Dreamy Draw Drive and north to south of the Preserve. The Segment 4 alignment is from north of SR-51, north of the Preserve area, along 26th Street to Shea Boulevard. The selected CMAR will work as a team with the designer of record and City staff to ensure an efficient design approach for the project. The estimated total cost for construction for this project is $25,775,000. This project is in response to the results of the Large Transmission Main Assessment Program, which determined the need to rehabilitate a portion of the City's 48-inch water transmission main defined as Scenario 3B. The project was split into four phases defined as Segments 1 to 4. Segments 2 and 3 have been completed while Segments 1 and 4 still need rehabilitation. Construction methods could potentially consist of slip line rehabilitation, open trench replacement, or a combination of the two and are subject to final design of the project. Questions pertaining to this selection process or contract issues should be directed to the Contract Specialist, Heather Roye at (602) 261-8894.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects