Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

December 11, 2023

February 9, 2024

To Be Determined

Site Work

No Information to Display

$49,000.00

Public - City

img_map_placeholder

To Be Determined, Russellville, AL

Subscribe to View Full Documents

The work of labor for the Radford "Joe" Murray Wastewater Treatment Plant Upgrades Project Contract "1" New Sludge Pump Installation & Structure Modifications - CWSRF Project No. CS010876-02. The principal items of work are detailed herein below: Installation of a New Sludge Pump - Labor Only Piping Modification - Labor Only Pump Station Modification - Furnish and Install. The Contractor is hereby advised that TIME IS OF THE ESSENCE on this project and that the contract time of 60 consecutive calendar days total and noted restrictions shall be strictly observed. LIQUIDATED DAMAGES WILL BE ASSESSED IF THE CONTRACT TIME IS EXCEEDED. The successful bidder must furnish a Performance Bond for one hundred (100%) of the bid amount and a Payment Bond for one hundred (100%) percent of the bid amount and must secure his bond from a bonding company's representative or agent in the State of Alabama. No bid may be withdrawn after the time for opening bids has passed. The Owner reserves the right to hold the bids for a period of sixty (60) days after the date of receiving Bids. The Owner reserves the right to reject any or all bids, to waive any informality in any bid, and to accept any bid considered advantageous to the Owner. The contractor shall not that funds for this project are provided through CWSRF (Clean Water State Revolving Funds) and ARPA Funds. All Applicable Federal Guidelines must be met. There will be no pre-bid meeting.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.