Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

April 16, 2024

October 16, 2025

1755 Bd René-Laennec

Renovation

No Information to Display

$2,000,000.00

Public - State/Provincial

img_map_placeholder

1755 Bd René-Laennec, Laval, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference number : 1765965 Deadline for receiving complaints: 2023-10-10 This project consists of replacing the osmosis water system in the laboratories and URDM at the Cité-de-la-Santé Hospital located at 1755 boulevard René-Laennec, Laval (Quebec) H7M 3L9. The contractor must take into consideration that this building is a hospital that remains occupied for the duration of the work. The building's activities are continuous 24 hours a day, 24 days a week. To ensure cohabitation allowing continuity of care, the contractor must be aware of the methods to be followed for phasing work, service cuts, temporary installations and other instructions specific to a work in a hospital environment. The work includes, but is not limited to: - The provision of all permits other than the required building permit, including related documents; - Demolition of elements; - Temporary work; - Containment work related to infection control; - Containment work relating to the safety of users; - Drilling; - The coordination of the work according to the phasing and the schedule to be provided by the contractor; - Participates in weekly meetings with the project manager and other meetings as requested; - Waste removal; - Daily and final cleaning of the construction site; - The provision of documentation documents and the closure of the site.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.