Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2023

December 18, 2023

No Information to Display

1200 N Canyon Blvd

Remodeling, Renovation, Site Work

No Information to Display

$10,731,815.00

Public - City

img_map_placeholder

1200 N Canyon Blvd, Monrovia, CA

Subscribe to View Full Documents

The Project Includes: Demolition of saw-cut and removal of existing: concrete, curb and gutter, headwall, gutter pan. Saw-cut and removal of existing: AC pavement, AC patch, AC Berm, AC pulverization, Cold milling of AC pavement. Remove trees, and tree stomps, cold mill AC pavement, excavation, and grading for all structures in the project. Remove chain link fence, wheel stops, AC pavement, AC pavement at parking lots, curbs, curb, and gutter, remove and salvage signs. Demolition of existing septic tanks, removal of existing sewer line clean outs and access boxes, concrete slabs at education area. Construction of: AC pavement rubberized w/fibers, AC pavement, Chip Seal, concrete curb, curb and gutter, concrete pavement, drive approach, sidewalk, spandrel, concrete pavement, mountable curb, Cross gutter, concrete v-ditch, concrete bench, concrete raised platform, concrete stairway, ADA ramps, concrete walls, concrete slope protection, rock wall, concrete headwall, concrete retaining walls. Water Improvements: 6" ductile iron pipe, pipe fittings, pipe elbows and bends, gate valves, fire hydrant assemblies, water service assemblies, water services, trenching for pipe, AC patch, adjust manholes, adjust utilities apparatus, abandon pipe cut and plug, relocate fire hydrant assembly, pothole for utilities, ductile iron manifolds, water booster pump, booster pump electrical control, electrical service for booster pump, booster pump building, water fountains, pipeline pressure testing and disinfectant. Sewer Improvement including new sewer lines made of HDPE, sewer manholes, sewer line connections, box culvert crossovers, sewer lift station, electrical service for lift station, electrical control panel for lift station, enclosure for lift station electrical controller, potholing of utilities, sewer bypass and dewatering. Relocation of existing k-rails, viewing devices, repair rock stairway, barrier gates w/chain, Ranger Kiosk Remodel, new wood railing at box culverts, new wood railing at view area, new chain link fence w/top rail, electrical conduit and wiring at education area, lighting poles, concrete seat walls with stone veneer, raised concrete platform with stone veneer and concrete seat caps. Striping and signage, SWPPP and erosion control implementation, construction staging and traffic control, public notification, pedestrian, and vehicular access, protect in place existing structures, mobilization, demobilization, bond, and insurance. The Engineer's Estimate for this project is $ 7,202,894.50

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects