Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

December 4, 2023

December 3, 2026

3600 Presidential Blvd

Addition, Demolition, Renovation, Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

3600 Presidential Blvd, Austin, TX

Subscribe to View Full Documents

Austin-Bergstrom International Airport (AUS) is proud to announce the launch of an ambitious Airport Expansion and Development Program (AEDP) aimed at catering to the travel needs of the rapidly growing Central Texas population. As part of this progressive initiative, this procurement is for Phase 2 of the Barbara Jordan Terminal (BJT) Optimization - Area 2. This project is comprised of multiple project requirements. The first critical requirement will be the BJT Atrium Infill. Presently, passengers are experiencing long queues outside of the terminal, which necessitates immediate action. The Atrium Infill requirement will not only alleviate this issue but also create valuable additional square footage to improve both the ticketing and security queueing areas of the BJT. The additional space will effectively accommodate the queuing needs for ticketing and security processes. Moreover, it will offer flexibility in utilizing the concourse level for various purposes. BJT renovations & additions including the infilling of the open atrium floor of the Concourse Level (above baggage area) to create more public ticketing area and the FIS Customs renovation and addition to the international arrival processing and inspection area. Project includes renovation, updating and modernizing existing areas in the Terminal as needed for customer comfort and convenience. DBE 10.34% The surety must obtain reinsurance for any portion of the risk that exceeds 10% of the surety's capital and surplus. For bonds exceeding $100,000, the surety must also hold a certificate of authority from the U.S. Secretary of the Treasury or have obtained reinsurance from a reinsurer that is authorized as a reinsurer in Texas and holds a certificate of authority from the U.S. Secretary of the Treasury. the Principal to provide Performance and Payment Bonds in the amount of 100% of each such Guaranteed Maximum Price within 10 days after the execution of the Work

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.