Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 23, 2023

June 24, 2024

No Information to Display

14th St & Illinois St

New Construction, Site Work

No Information to Display

$37,500,000.00

Public - State/Provincial

img_map_placeholder

14th St & Illinois St, Golden, CO

Subscribe to View Full Documents

Reference Number 0000331101 The Colorado School of Mines (Mines) is proposing an adaptive reuse (or possibly new construction) project to transform the main campus quad. The existing Chauvenet Hall (located at Illinois St. and 14th St.) will be converted to a Dining Hall and Student Services Building. The program will include Dining, Study, and Student Service space and may include Academic and Lab spaces all totaling approximately 38,000 GSF. The construction budget for this project is $37.5 million. Mines seeks a collaborative partner to participate and offer insight from the Schematic Design phase through Construction. Mines anticipates using a Construction Manager/General Contractor (CM/GC) approach to project delivery. A Guaranteed Maximum Price (GMP) and an updated project duration schedule will be established by the Architect/Engineer and the Construction Manager/General Contractor in conjunction with the Colorado School of Mines. The CM/GC will evaluate, among other things, availability of materials and labor, project schedule, project costs as they relate to the established budget, constructability, and will work closely with the Architect/Engineer and the Colorado School of Mines throughout the planning, design, and construction phases of the project. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % -Construction Q3 2024 - Q2 2026 October 6, 2023, Respondent initiated email requests for clarification. *The State reserves the right to reject any or all proposals on the basis of being unresponsive to this RFP or for failure to disclose requested information.

106 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.