Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2023

December 18, 2023

August 24, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$10,396,679.00

Public - City

img_map_placeholder

Multiple Locations, Visalia, CA

Subscribe to View Full Documents

The work to be done consists, in general, of excavation; access road construction; installation of a pan lysimeter consisting of a prepared subgrade, geosynthetic clay liner, HDPE geomembrane liner and drainage geo composite; and a soil operations layer covering approximately 33 acres. Work also includes providing a leachate collection and removal system consisting of perforated HDPE pipe in trenches and sumps and backfilled with rounded drainage rock, submersible leachate and lysimeter pumps, control systems, and a new power supply and electrical connections. A leachate storage system is required consisting of two 5,100 gallon leachate storage tanks and a concrete secondary containment structure for each system. Other work includes various drainage structures and facilities, aggregate access roads, an HMA Entrance road and securing, transporting and applying all construction water. The work is shown on the Plans and specified in the special provisions, technical specifications and construction quality assurance manual. Other items or details not mentioned herein that are required by the Plans, Standard Specifications, Technical Specifications or the Special Provisions shall be performed, constructed, furnished or installed. Bidders may visit the project site. This project is off of the Federal Highway System. Question Deadline 10/11/2023 at 5:00 PM PT Technical questions should be directed in writing to Jonah Trevino at the Solid Waste Department, 5955 S. Mooney Blvd, Visalia CA 93277 or at jtrevino@tularecounty.ca.gov. No questions will be accepted within five (5) working days of the bid opening (Questions must be received All questions and responses will be continuously posted on the County website. Submit the bidders security in the form of cash, a bidders bond, or a certified check or cashiers check, in the amount of ten percent (10%) of the amount bid. A Performance Bond must be furnished by the awarded bidder in the amount of one hundred percent (100%). A Payment Bond must be furnished by the awarded bidder in the amount of one hundred percent (100%) This project is a non federal aid project with an estimated project cost of approximately $11,500,000 The Project is to be completed within ONE HUNDRED NINETY (190) working days from the date to be established in the NOTICE TO PROCEED. The Contract includes provisions for Liquidated Damages if the Project is not timely completed. The Board of Supervisors reserves the right to reject any or all bids, and/or waive any informality in any bid, and/or determine in its discretion the responsibility of any bidder.

32 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details