Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2023

November 20, 2023

May 1, 2024

Multiple Locations

Site Work

No Information to Display

$95,000.00

Public - County

img_map_placeholder

Multiple Locations, Omaha, NE

Subscribe to View Full Documents

Older Towne Commons Basin Conversion. Approximate Quantities Item Item No. Code Item Description 100 101.003 Install Curb Inlet Protection 101 101.040 Install Construction Entrance 102 102.000 Clearing and Grubbing - General 103 201.200 Remove Unsuitable Material (Muck-out From Bottom of Basin, Haul-off) 104 702.811 Construct Permanent Outlet Structure (Area Inlet Type Ii) 105 702.901 Construct 60" I.d. Storm Manhole 106 803.000 Install Rolled Erosion Control, Type I 107 806.100 Construct Type B Riprap 108 Remove Temporary Sediment Basin Riser 109 Construct 6'x6' Anti-steep Collar Quantity Unit 1.00 Ea 1.00 Ea 1.00 Ea 2,000.00 Cy 1.00 Ea 6.00 Vf 1,850.00 Sy 30.00 Tn 1.00 Ea 1.00 E The amount of the engineer's estimate of the cost of said improvements (exclusive of engineering, fiscal, legal, interest, and miscellaneous costs) is $95,000.00. Plans and Specifications for Said Work, at the Locations Shown on the Detailed Drawings and in the Specifications Now on File With the Clerk of Said District and at the Office of Olsson and Are Available ad Technical Supply and Standard Digital, Which Proposals as Are Received Will, at That Time, Be Publicly Opened, Read Aloud and Tabulated. The Work Consists Essentially of the Following Estimated Quantities. Bid Bond or a Certified Check in the Amount Not Less Than 5% of Bidder's Maximum Bid Price ( Determined by Adding the Base Bid and All Alternates) Made Payable to the Treasurer of Sanitary Improvement District 601 as Security That the Bidder to Whom the Contract May Be Awarded Will Enter Into a Contract to Build the Improvements in Accordance With This Notice to Contractor and Will Give a Contract and Maintenance Bond in the Amount of 100% of the Total Contract Price, All as Provided in the Specifications Sanitary Improvement District 601 of Douglas County, Nebraska, reserves the right to reject any or all bids received and to waive informalities and irregularities.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects