Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2023

November 30, 2023

January 11, 2024

350 Main St

Renovation

No Information to Display

$600,000.00

Public - City

img_map_placeholder

350 Main St, El Segundo, CA

Subscribe to View Full Documents

In general, the Phase 1 HVAC Improvements will consist of demolition and installation of two rooftop HVAC units. The units that are to be replaced consists of a 7.5-Ton package unit, A 40-Ton Multizone unit comprised of a rooftop AHU. Replacement of associated exterior HVAC duct, duct supports, external refrigerant piping, controls, valves, service connections, electrical wiring, hangers and supports, duct insulation, vibration and seismic controls, like-for-like wiring, breakers, circuit disconnects and testing and commissioning. Work on the Project must be performed in strict conformity with Specifications No. PW 23- 03: Phase 1 City Hall HVAC Improvements Project which is filed with the Public Works Department. Contractors bidding the project shall provide a minimum of five government agency references, preferably municipal, for building similar projects (in terms of scope, size, type, magnitude and complexity) as the prime contractor in the past five (5) years. Bidders shall include references, etc. to demonstrate qualifications. Question Deadline 10/16/2023 at 4:00 PM PT Questions regarding the bid shall be submitted Electronically General Scope of Work: The scope of work consists of the demolition and installation of two Rooftop HVAC units. The units that are to be replaced consist of a 7.5-Ton package unit, a 40-Ton Multizone unit comprised of a rooftop AHU. The associated work consists of the following items: replacement of associated exterior HVAC duct, duct supports, external refrigerant piping, controls, valves, service connections, electrical wiring, hangers and supports, duct insulation, vibration and seismic controls, like-for-like wiring, breakers, circuit disconnects as well as Testing and commissioning. 1-2. Location of the Work: The project will occur at City Hall, 350 Main Street, El Segundo, CA 90245 1-3. Working Days and Time for Completion: Contractor will commence work on date specified in the Notice to Proceed to be issued to the Contractor by City of El Segundo Public Works Department and shall complete work within Thirty (30) working days after the date of commencement.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.