Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2023

November 16, 2023

March 23, 2024

612 Southwestern Pkwy

Renovation

No Information to Display

$260,000.00

Public - County

img_map_placeholder

612 Southwestern Pkwy, Louisville, KY

Subscribe to View Full Documents

All inquiries and questions prior to the bid opening shall be Directed, in writing, to MSD's Project Manager, Julie Potempa at julie.potempa@louisvillemsd.org. Questions received less than five days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD's Chief Engineer, David Johnson, P.E. The Engineer's Construction Cost Estimate for this project is between $ 100,000.00 and $ 300,000.00 Msd supplier diversity minority and woman business enterprise program policy and procedures manual, modifying the mbe and wbe participation goals on construction services and construction-related services, in accordance with the msd disparity study (study). The study provided the factual predicate for msd to establish new mbe and wbe goals in msd contracting. The msd mbe\wbe program modified subcontracting goals are listed. If the contractor is unable to meet the goals, they must demonstrate adequate "good faith efforts" in accordance with the msd supplier diversity minority and woman business enterprise program policy and procedures manual (mbe/wbe program). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Description and location of Project: The principal features of the Work to be performed under this Contract include, but are not limited to the following: 1. Removal and disposal of existing roof system. 2. Installation of new roof system. 3. Installation of flashing and sheet metal work 4. Installation of fall protection and safety equipment Question Deadline 10/07/2023

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.