Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

November 13, 2023

February 11, 2024

To Be Determined

Site Work

No Information to Display

$564,890.00

Public - City

img_map_placeholder

To Be Determined, Aberdeen, MS

Subscribe to View Full Documents

This project includes dolphin fender replacement, structural repairs, and repainting of dolphins. The above general outline of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, equipment and materials required by the specifications and the drawings referred to therein. The contract time is 90 consecutive calendar days. Liquidated damages will be assessed in the amount of Two Hundred Fifty Dollars ($250.00) for each calendar day the Work has not achieved Substantial Completion. Each Bidder must deposit with his proposal, a Bid Bond or Certified Check in an amount equal to five percent (5%) of his bid, payable to the City of Aberdeen, as bid security. The successful bidder will be required to furnish a Payment Bond and Performance Bond each in the amount of one hundred percent (100%) of the contract amount. The City of Aberdeen reserves the right to reject any and all bids and to waive any informalities or irregularities therein. Special Damages-In addition to the amounts provided for liquidated damages, Contractor, in the event of such default, shall pay the Owner the actual costs reasonably incurred by Owner for engineering and inspection forces employed on the work after the time stipulated for the completion of the work.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.