Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 12, 2023
November 13, 2023
November 30, 2023
615 Rollstone St
Renovation
No Information to Display
$56,418.00
Public - City
615 Rollstone St, Fitchburg, MA
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Curtain install and rigging at Memorial Middle School. Question Deadline 10/05/2023 All information with respect to this solicitation shall be directed through the Mary A. Delaney Chief Procurement Officer, including questions, clarifications, or observations. Bidder shall not contact any City employee, agent, official, department, department head, or agent with regards to this solicitation. Doing so may lead to i disqualification of the bid. STAGE CURTAINS & TRACKS - The FPS is seeking to replace the original (1967) auditorium rigging/chain support and curtains in the Memorial Middle School with modern, inherently flame-retardant, polyster velour valance, traveler, border, and side leg curtains and related rigging chains and hardware. 1. Vendor shall refurbish and/or replace existing tracks, replacing damaged/worn parts as necessary. Replace all operating hardware on the existing tracks for Main Traveler, Rear Traveler and Legs, to include new Live and deadend pulleys, master carriers, slave carriers, tensioned floor pulleys and operating cords. 2. Relocate the existing projection screen as necessary to accommodate for new locations of curtains. 3. Install one (1) Main Valance Curtain panel at minimum quality specification of 20oz velour and color (TBD) 6'h x 40'w. The fabric must be inherently flame-retardant polyester velour, color - (TBD). To be sewn with 50% fullness using box pleats with appropriately sized top, side, and bottom hems. 4. Install two (2) Bi-Parting panels for the main curtain at minimum quality specification of 20oz velour and color TBD - 18'h x 23'w. The fabric must be inherently flame-retardant polyester velour, color TBD. Panels will be sewn with 50% fullness using grommet-in pleats. 5. Install four (4) Border Curtain panels at a minimum quality specification of 20oz inherently flame-retardant polyester velour, color TBD - 6'h x 40'w. Panel will be sewn with 50% fullness using box pleats. Top hem to have appropriately sized Nylon webbing with appropriate tie lines, side hems and a bottom hem. 6. Install three (3) pairs of Side Leg Curtain panels at a minimum quality specification of 20oz inherently flameretardant polyester velour, color - TBD - 18'h x 7'w. Panels will be sewn with 50% fullness using box pleats. Top hem to have appropriately sized Nylon webbing with s-hooks, side hems and a bottom hem with a separately sewn internal chain pocket. 7. Install two (2) Bi-parting Mid Draw panels at a minimum quality specification of 20oz inherently flame-retardant polyester velour, color - TBD - 18'h x 23'w. Panels will be sewn with 50% fullness using grommet-in pleats. Top hem to have appropriately sized Nylon webbing with brass grommets and s-hooks, side hems and bottom hem with a separately sewn internal chain pocket. 8. Install two (2) Bi-parting Rear Curtain panels at a minimum quality specification of 20oz inherently flame-retardant polyester velour, color - TBD - 18'h x 23'w. Panels will be sewn with 50% fullness using grommet-in pleats. Top hem to have appropriately sized Nylon webbing with brass grommets and s-hooks, side hems and bottom hem with a separately sewn internal chain pocket. 9. Replace the following for the rigging/chain support system. o all chain support for the rigging system with 3/16" proof coil chain, rated for overhead support; o New rated beam clamps to attach to the existing trusses o Connection points at both beam clamp and pipe/track with rated bolts and/or rated pin shackles (as applicable). o Pipe to be changed to schedule 40 1.5" iron pipe (painted black) with 18" internal support sleeves at splices and secured with lock nuts. o Tracks - change all carriers, cord, both end pulleys on each track and provide new floor pulleys.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Fitchburg, MA
Bid Date: Nov 08 2023
Fitchburg, MA
Bid Date: Oct 18 2023
Fitchburg, MA
Bid Date: Oct 18 2023
Fitchburg, MA
Bid Date: Dec 05 2023
Fitchburg, MA
Bid Date: Oct 11 2023
Fitchburg, MA
Bid Date: Jun 05 2019
Fitchburg, MA
Bid Date: Oct 26 2023
Fitchburg, MA
Bid Date: Aug 31 2023
Fitchburg, MA
Bid Date: Sep 28 2023
Fitchburg, MA
Bid Date: Sep 12 2023
Fitchburg, MA
Bid Date: Oct 18 2023
Fitchburg, MA
--
Fitchburg, MA
Bid Date: Aug 04 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
