Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

December 25, 2023

July 22, 2024

To Be Determined

Renovation

No Information to Display

$1,254,481.00

Public - City

img_map_placeholder

To Be Determined, Revere, MA

Subscribe to View Full Documents

A. The work of this Section consists of asphalt shingles where shown on the Drawings, as specified herein, and as required for a complete and proper installation. Work includes, but is not limited to the following scope. 1. At all Buildings included in the Siding Replacement scope of work: a. Remove and dispose of all existing asphalt shingles and cedar shingle roofing at entrance canopies only. b. Coordinate work with siding replacement scope. 2. At all Buildings included in the Roofing Replacement scope of work: a. Remove and dispose of all existing asphalt shingles and cedar shingle roofing in its entirety, including but not limited to underlayment, and accessories at all building roof areas. Remove and dispose of roofing at entrance canopies only at Buildings included in the Siding Replacement scope of work. b. Remove and dispose of existing soil stack and bathroom exhaust vent flashings. c. Detach existing siding at shed roofs to remove existing metal flashings and attach new metal flashings. d. Cut and remove existing roof sheathing continuously along ridge peak to allow installation of new ridge vent and to provide ventilation. e. Remove and dispose of existing gutters and accessories, leaving downspouts in place for reuse. f. Remove and dispose of existing fascia and rake trim boards and aluminum coil cladding. g. Carefully remove existing satellite dishes and retain on site. h. Upon completion of the selective demolition work, review all substrates to receive new materials for damage and deterioration. Notify the Architect in writing of any damaged or deteriorated substrates which require repair prior to installing new materials. i. Furnish and install pressure treated 2x framing to sister rafters at louver infill areas. j. Furnish and install CDX plywood sheathing at roof and wall infill areas as noted on the drawings. Envelope Upgrade of Roofs, Siding, Windows and Bulkheads Phase IV & V at State Aided Development: Gold Star Mothers 200-1 in Revere, Massachusetts All General Bidder questions must be received by 10/19/23 @ 10:00 A.M. in order to be answered by addendum.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.