Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2023

November 2, 2023

No Information to Display

301 W 18th St

Renovation

No Information to Display

$425,000.00

Public - City

img_map_placeholder

301 W 18th St, Newton, NC

Subscribe to View Full Documents

The Work of This Contract Shall Consist of the Bid Proposal as Outlined in the Drawings and Specifications Project Will Begin in the Fall of 2023 All General Contractors Are Hereby Notified That They Must Have a Proper License Under the State Laws of North Carolina. A Performance Bond and a Labor and Material Bond Will Be Required for This Project Insurance Each Contractor Shall Provide General Liability, Workman's Comp, Vehicle for This Project No Bid May Be Withdrawn After the Scheduled Closing Time for the Receipt of Bids for a Period of Thirty (30) Days. Bid Bond is Required. Job Site Progress Meetings Will Be Held Every Other Week at the Start of Notice to Proceed. Note: Construction Will Be Done While School is Being Held Therefore the Asbestos Abatement and Window Replacement Will Be Done in Stages With a Projected Maximum of 10. General Contractor to Coordinate Asbestos Removal With Construction Schedule of Window Availability/lnstallation and Discovery High School Individual Classroom Schedule of Availability. Jessica Lundsford Act: Background Checks. At Least Ten (10) Days Prior to Any Employee of the Contractor Entering Onto the Location, the Contractor Shall Conduct a Check on the N.c. Sex Offender and Public Protection Registration Program, the N.c. Sexually Violent Predator Registration Program and The National Sex Offender Registry of Each Employee Who Intends to Enter Onto the Location. Within Five (5) Days Prior to Any Employee of the Contractor Entering Onto the Location, Contractor Shall Certify in Writing to the Board That Contractor Has Completed the Checks and That No Employee of Contractor Intending to Enter Onto the Location Has a Record on the Aforementioned Registries or Registration Programs. No Substitutions for Materials Specified in Construction Documents Will Be Accepted The Owner Reserves the Right to Reject Any or All Bids and Waive Informaliti

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.