Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

November 13, 2023

April 11, 2024

25 Hecker Ave

Renovation

No Information to Display

$229,000.00

Public - City

img_map_placeholder

25 Hecker Ave, Darien, CT

Subscribe to View Full Documents

Renovation of Female Bathroom. Business Enterprises are encouraged to bid. The Town of Darien reserves the right to reject any and all bids. The following information shall be submitted with each bid: A certified check or bank draft, payable to the Town of Darien; or, a satisfactory bid bond executed by the bidder in an amount equal to 5% of the bid amount The Project consists of the construction and demolition of temporary locker room and construction of permanent interior renovations at an existing occupied structure to provide for new Locker Room and Restroom Facilities for the Police Facility for the Town of Darien, CT. Existing facility is located at 25 Hecker Avenue, Darien, CT, as shown and described on Contract Documents prepared by Jacunski Humes Architects, LLC, Berlin, CT. B. The Work consists of minimum sitework and site preparation for areas of new construction. New construction for the proposed Police Locker Room Facility includes non-combustible construction to provide program space for Police personnel. Interior renovations to the existing Police Department are for improvements to the Locker Rooms and associated Rest Rooms. C. Interior to the existing Police building includes, but is not limited to, selective demolition, cutting and patching, wall construction, doors, hollow metal frames, glass, gypsum drywall, metal stud framing, wardrobe lockers, interior casework, and new interior finishes, plumbing, electrical, and mechanical systems. D. The General Contractor is advised that the site is town-owned property and that the Town of Darien may be performing operations for Owner's elected improvements of the project site and facilities. The Owner shall coordinate all necessary site activities with, and through, the General Contractor

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.