Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

December 25, 2023

June 22, 2024

926 Green St

Renovation

No Information to Display

$3,000,000.00

Public - County

img_map_placeholder

926 Green St, Warner Robins, GA

Subscribe to View Full Documents

Project consists of the removal of existing metal roofing over existing to remain retrofit framing and installation of new metal roof panels, installation of a new single ply membrane over existing built-up roofing, and installation of a new single ply membrane over the original metal roof system. Replacement of metal wall panels, coping metal, gutters, and downspouts is included. Successful bidder shall begin the Work on receipt of the Notice to Proceed (est.November 2023) and shall complete the Work within 180 days of beginning work onsite. The bidder shall submit with the bid form an estimated material procurement timeline along with an estimated construction timeline. Bid security shall be submitted with each bid in the amount of [5] percent of the bid amount. No bids may be withdrawn for a period of [60] days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. A Performance Bond, separate Labor and Material Payment Bond, and Insurance in a form acceptable to Owner will be required of the successful Bidder. B. Prior to submission of a proposal, it is strongly encouraged for bidders to evaluate their current and future workload as it relates to the project timelines specified above. Project cost range is approximately $3,000,000.00. 1. Removal of existing metal roofing over existing to remain retrofit framing, installation of new single ply membrane over existing built-up roofing, and installation of a new single ply membrane over the original metal roof system. Replacement of coping metal, gutters, and downspouts is included. Miscellaneous mechanical work is required for removal and reinstallation of mechanical units on rooftops.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects