Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 13, 2023

November 13, 2023

November 13, 2026

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Toronto, ON

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference Number 0000256213 It is estimated that the TTC will require the supply of four (4) prefabricated precast beams (and the respective standard set of bearings) for each year of the Contract (i.e. 2024, 2025 and 2026). However, the TTC reserve the right to increase the required quantity up to 12 beams per year (and the respective bearings) and the Company shall ensure that they have the capacity to manufacture and supply beams and bearings to this indicated quantities. Presently, the Contract drawings are not available yet, they will be issued each year by January 15th, once the beam replacement list is updated annually by the TTC Inspectors. Occasionally, additional beams may be required after January 15th. The Terms of Reference contains sample drawings only (Reference Drawings) showing variations of various beams. These drawings are to be used for reference and estimating purpose only and not for fabrication. All beams and bearing pads are very similar in dimensions (width, length and height) and have some minor changes from beam to beam. The sample drawings (Reference Drawings) included have covered each extreme condition and addressed all possible variations. TTC offers for use its existing steel mold (owned by the TTC), which was previously used to fabricate precast beams. TTC cannot guarantee the performance and condition of the existing mold and as result the existing mold will be made available to the bidders for inspection and evaluation purposes during a pre-bid meeting as in indicated in the Contract Documents. The term of this contract shall be up to three (3) years with option to extend two (2) further terms of up to one (1) year, based on TTC discretion and negotiated pricing. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.