Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2023

November 17, 2023

September 1, 2024

9700 52nd St

Renovation

No Information to Display

$625,800.00

Public - City

img_map_placeholder

9700 52nd St, Kenosha, WI

Subscribe to View Full Documents

Sealed bids for furnishing all labor and materials necessary for the construction of: Project #22-1575 Kenosha Fire Station 7 Renovations all in accordance with specifications on file in the office of the Director of Public Works. The project includes the removal and replacement of the existing windows, some of the exterior doors, as well as some of the exterior façade. The interior framing of the exterior wall is being removed and replaced and other Work indicated in the Contract Documents. Each bid must contain the full name of every person or company interested in the same and must be accompanied by a contract and bid bond, a certified check, or a bank cashiers check, in the sum of five per cent (5%) of the bid, payable to the City of Kenosha as a guarantee that if the bid is accepted, a contract will be entered into and its performance properly secured within fifteen (15) days of the award of contract. Should any bid be rejected, such check will be forthwith returned to the bidder, and should any bid be accepted, such check will be returned upon the timely and proper execution and securing of the contract. In case the successful bidder shall fail to execute the contract and performance bond, the amount of the bid bond or check shall be forfeited to the City as liquidated damages. The form provided for Bidders Proof of Responsibility shall be completed and returned to the Director of Engineering not less than five (5) days before the date of bid opening. The successful bidder shall be required to furnish Workers Compensation and Liability Insurance as enumerated in the specifications. The City of Kenosha reserves the right to reject any or all bids, or to accept any bid considered most advantageous to the City of Kenosha. Removal and replacement of the existing windows, some of the exterior doors, as well as some of the exterior façade. The interior framing of the exterior wall is being removed and replaced and other Work indicated in the Contract Documents.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.