Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

November 13, 2023

February 11, 2024

4th Pl SW

Paving, Site Work

No Information to Display

$900,000.00

Public - City

img_map_placeholder

4th Pl SW, Alabaster, AL

Subscribe to View Full Documents

This project includes approximately 1,000 linear feet of 6 ductile iron water line, 2 and 3/4 service lines, directional boring, water meter installation, connection(s) to existing system, ductile iron fittings, valves, tapping sleeve and valves, fire hydrants, existing water line removal, asphalt trench repair, and all other necessary water line appurtenances. Direct questions in writing to James M. Cassidy, P.E., at the office of the Engineer, at james@insiteengineering.org. It is the bidders responsibility to ensure the email is received.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.