Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 3, 2024

October 3, 2024

January 20, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$164,000.00

Public - City

img_map_placeholder

Multiple Locations, San Carlos, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe to View Full Documents

**As of September 13 , 2024 project has not been awarded , Anticipated award date is on September 23, 2024 .** The scope of work generally includes the following: Work includes, but is not limited to, furnishing all labor, materials, equipment, and services necessary or required to perform and construct, complete in place and in satisfactory condition, remove and replace sidewalk, remove and replace driveway, root pruning, curb & gutter and all related items as shown on the plans and specified herein and as directed by Project Manager in the field. Removal and replacement of concrete sidewalk, driveways, curb and gutter shall be in accordance with Appendix A. Bids are required for the entire work described herein in accordance with the instructions to bidders. The term of the contract shall be for one year or until the contract budget is exhausted whichever comes first from the award date. The Contractor shall possess a Class A California contractor's license at the time this contract is awarded. Bids must be accompanied by a Proposal guarantee amounting to ten (10%) percent of the bid as described in the specifications . The allotted time to complete the project will be 80 working days (standard 5-day work week). The City reserves the privilege of rejecting any and all proposals or to waive any irregularities or informalities in any proposals or in the bidding. No bidder may withdraw his proposal for a period of ninety (90) calendar days after the date set for opening of proposals. Question Deadline 08/29/2024 All questions and comments regarding the plans and specifications should be directed to the Project Manager indicated below and will only be responded to if received in writing at least five (5) working days before the bid opening. Questions received after this time and date may not be addressed. City of San Carlos- Public Works Department 600 Elm Street, San Carlos, CA 94070 Attention: Evan Cai, Associate Engineer ecai@cityofsancarlos.org Telephone: (650) 802-4196 Fax: (650) 595-6704 Estimated Range $500-600k *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects