Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2023

November 2, 2023

April 30, 2024

Multiple Locations

Renovation

No Information to Display

$220,000.00

Public - City

img_map_placeholder

Multiple Locations, Springfield, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Furnish and install - Energy Star Rated 95% sealed combustion natural gas furnaces 2 pipe system The Contractor shall Adapt to existing duct system. Contractor is responsible to ensure that existing duct system is sized correctly and ensure proper air flow. Use black iron gas piping for furnace connection Ensure attic ductwork is insulated and in good condition. Ensure proper distribution and recovery. Ensure proper combustion air. Install new filter grills. Install return grills over the slab home bedroom doors. Install electrical disconnect switch at the furnace and reconnect to existing wiring. Install new low voltage thermostat wiring Install new White Rogers 1f86-344 series 80 thermostats (or equal quality) non programable. Check plenum and ductwork for moisture holes, rust and leaks. Use iron pipe on gas line. Check New line sets and install new if necessary Fire caulk around vents in ceiling. Q/A Cutoff Date: 09/21/20238 Q/A Cutoff Time: 05:30 PM EDT A 5% Bid Guarantee will be required for all projects greater than $50,000 (due with bid). Performance Bond and Payment Bond; or 20% cash escrow; or 25% irrevocable letter of credit will be required for the amount of the contract should the contract exceed $50,000.00 (due at contract signing). The SHA reserves the right to reject any or all bids, to waive any informality in the IFB process, or to terminate the IFB process at any time, if deemed by the SHA to be in its best interests. The SHA reserves the right not to award a contract pursuant to this IFB

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects