Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 6, 2023

October 30, 2023

May 4, 2024

Multiple Locations

Site Work

No Information to Display

$600,000.00

Public - City

img_map_placeholder

Multiple Locations, Statesville, NC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The City of Statesville is seeking proposals from companies for a pipe replacement. The City of Statesville reserves the right to reject any and/or all proposals. Pipe Replacement at Wickersham Dr between Brookmeade Dr & 115 Wickersham Dr: Site is located as a one way in/one way out accessibility. The Contractor shall keep access during construction for citizens. All sites identified shall be restored to like new condition, but not limited to reseeded with a turf type tall fescue seed and mulched, within 90 calendar days after execution of the contract. The entire work area (within construction limits) shall also be cleared of any debris, overgrown brush, trash, dead trees, fencing or other material. The Contractor shall leave the site very clean and free of all debris whether the debris is associated with the pipe repair or not. Live trees shall not be damaged or removed as part of the repair, unless noted by the Engineer. Small shrubs shall be removed and disposed of properly. Without exception, the property must be cleaned and seeded and mulched within ten (10) working days after the pipe repair is completed. All applicable permits must be acquired. All materials shall be disposed of in accordance with all applicable state and federal regulations. All correspondence from the Contractor to the City shall be by e-mail to the Project Contact and Department Head listed as follows: Randall Moore (Project Head) Cory Sloan (Engineer) rmoore@statesvillenc.net csloan1@statesvillenc.net

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects