Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

April 15, 2024

September 28, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$1,351,944.00

Public - City

img_map_placeholder

Multiple Locations, Ferndale, MI

Subscribe to View Full Documents

Reference Number 0000329776 Question Deadline 10/03/2023 at 12:00 PM ET Questions are submitted online or All questions about the meaning or intent of the Bidding Documents are to be directed to Engineer Installing 2,400 feet of ductile iron water main within the public right-of-way of Mapledale Street (Bermuda to Hilton) and Jewell Street (Wanda to West End). Included in the work is the replacement of existing gate valves and fire hydrants, 32 domestic water services, 3,050 square feet of sidewalk and ADA ramp replacement, 675 feet of concrete curb and gutter replacement, 10,250 square yards of HMA cold milling and HMA Surface removal, 2,000 tons of HMA paving, lawn restoration and other associated work items. Job Location City of Ferndale General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 50 % - Surety Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % -- Bids shall be submitted on the forms provided by the Owner and shall be accompanied by a certified check or bid bond, payable to the City of Ferndale for an amount equal to five percent (5%) of the total base bid price. The accepted bidder shall be required to furnish a satisfactory Performance Bond, and Labor and Material Bond in the amount of 100% of the Contract Price, and Maintenance and Guarantee Bond of 50% for two years of the Final Contract Price. The cost of the bonds will be paid by the accepted bidder. *The City of Ferndale reserves the right to accept or reject any or all bids, in whole or in part, and to waive any informalities, therein when such waiver is in the interest of the City of Ferndale, and to award the contract to other than the low bidder. In order to efficiently complete the proposed work in the Contract and to schedule the requisite inspection and material testing, the Contractor shall prepare and submit a detailed progress schedule which identifies the major work items involved in this project prior to the preconstruction meeting. Major work items shall include water main installation, testing, service reconnections, pavement and sidewalk replacement, restoration and completion for each street under construction. Pavement replacement on Jewell will be independent of pavement replacement on Mapledale. Jewell Water Main Replacement and HMA Resurfacing o Start Date: April 15, 2024 (Approximate) o Open-to-Traffic Date: Sixty-One (61) Calendar Days o Lawn Restoration: September 14, 2024 Mapledale Water Main Replacement and HMA Resurfacing o Start Date: No earlier than June 10, 2024 o Open-to-Traffic Date: Sixty-Eight (68) Calendar Days o Lawn Restoration: September 14, 2024 o Final Completion: September 28, 2024

67 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.