Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 21, 2023

October 23, 2023

No Information to Display

To Be Determined

Site Work

No Information to Display

$10,676.00

Public - City

img_map_placeholder

To Be Determined, Cortland, NY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Interior Apartment Painting Specifications may be obtained from our office at 42 Church St. Or email lboyce@cortlandha.com to have a bid packet emailed to you. Questions about this project may be directed to Nick Giamei, Maintenance Supervisor at 607-753-1772. The owner accepts the right to accept or reject all bids and to waive any informalities to the bidding process. MBE/WBE/DBEMWBE . We have 380 units, 300 single units & 80 family units Full-Unit Painting. Unless otherwise specified by the Agency, the Contractor will be required to fully paint all interior areas of a unit. This includes walls, ceilings; interior trim; closet interior and doors; and door casings; and exterior doors, and door casings Keep a clean work area. DO NOT leave any debris outside of the units. Paint Application/ Clean-up. The Contractor shall take care not to apply paint to any hardware cabinets; windows; plumbing and electrical fixtures; flooring, etc. All paint spills, drops, drips or dust to be cleaned before the job is considered complete. Extreme caution must be used to avoid getting paint on any sprinkler components or fire alarm detection components. The contractor will be responsible for removing all paint from the above-mentioned components. Specific Required Painting Services. Each time a unit is painted, the contractor shall: Patch and sand, smooth, fill small punctures and holes as required for a clean finished look. (Small meaning 1" or less) o Wall prep, grease removal, tape removal, spot primer etc. Scrape away cracked and flaking paint. o Remove all electrical cover plates and light fixtures prior to painting. Re-install after painting. o Basement walls will be painted with provided waterproof masonry paint for applicable locations. Basement floors will be painted with provided "gray" floor paint for applicable units. Other paint may be used at CHA's instruction. o Primer coats or 2 coat jobs will be considered at 2x the one coat price. The contractor must have CHA authorization for a 2-coat job, i.e., smoke damaged units. o Paint to be applied by brush or roller only. No airless spray painting

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.