Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2023

December 1, 2023

December 21, 2023

Multiple Locations

Site Work

No Information to Display

$61,751.00

Public - County

img_map_placeholder

Multiple Locations, Santa Clarita, CA

Subscribe to View Full Documents

Question Deadline 09/22/2023 at 2:00 PM PT Last Day for Pre-Bid RFIs - project related questions shall be submitted via the District's eProcurement Portal Q&A feature. The scope of this project includes the maintenance painting of the following buildings located in Santa Clarita 1. Warehouse including loading dock area and metal overhang: Address: 21445 Centre Pointe Parkway 2. Portable classrooms and bathroom buildings (3): Address: 21445 Centre Pointe Parkway 3. Transportation Building: Address: 21429 Centre Pointe Parkway 4. Maintenance building overhang and connecting tilt-up wall: Address: 21425 Centre Pointe Parkway 5. Upper school bus parking lot Tilt-up fence wall and rolling metal gates (2): Address: 21425 Centre Pointe Parkway 1. Pressure Washing: o All exterior facades of each building/area shall be pressure washed to remove remaining paint and provide a suitable surface for maximum paint adhesion. 2. Crack Preparation and Patching: o Existing cracks greater than 1/4 inch shall be "V" cut using a diamond grinding wheel. o Cracks shall be patched with rapid-set mortar mix. o Spot prime patched areas as needed. 3. Door and Ramp Painting: o All man doors, roll-up doors, and trash enclosures shall be painted. Paint all area 2 ramps with traction paint, and entire safety rails. 4. Exposed Rebar Treatment: o Any exposed rebar shall be ground down and patched to ensure a smooth surface. 5. Surface Masking: o Landscaping, glass windows, and signage shall be properly masked to prevent paint overspray. 6. Window and Door Caulking: o Caulk shall be applied around windows and door frames to create a water-resistant bond. 7. Metal Substrate Preparation: o Metal substrates shall be prepared by scraping all loose paint and sanding as necessary. o Spot prime with rust inhibitor primer. o Apply two coats of Protec Paint finish from Vista Paint brand. 8. Color Scheme: o Main body: Two coats of Vista "Quicksand" or district-approved equivalent. o Trim, Doors, and Gates: Two coats of Vista "Bunglehouse Grey" or districtapproved equivalent This project is being managed by Wm. S. Hart Union High School District, owner, single prime contractors possessing an active class-type license(s) as listed in the table below. Package . Each bid must be submitted with security in an amount equal to 10% of the maximum bid, in one of the following forms: (i) a cashier's or certified check payable to the District; or (ii) a bid bond. Contractor commences Work: December 1, 2023 Contractor completes Work: December 21, 2023

26 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects