Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 5, 2023

November 6, 2023

December 16, 2023

2002 S Water St

Renovation

No Information to Display

$43,427.00

Public - City

img_map_placeholder

2002 S Water St, Burnet, TX

Subscribe to View Full Documents

As of 10/5/2023, this project has not yet been awarded. It is anticipated to be awarded after 11/14/2023. Question Deadline 10/02/2023 at 5:00 PM CT The Contract Documents and Specifications are available at the City of Burnet. Questions and requests for additional information shall be sent by email to: ebelaj@cityofburnet.com, or via CIVCAST The project is estimated at $60K to replace the roof of the fire department. Attached bidders should find the original roof drawings for reference. The Existing roof is shingles that were damaged by hail. The bid requires contractor to start work within 30-days of award. The project entails removing the old roof and associated components and installing a new one for approximately 11,700 Enclose at approximately 6:12 pitch. In more details the bid should encompass the following: Removal of existing shingles w/ Haul off & include dump and fees Check for soft/rotten wood Synthetic underlayment 940' of Owens Corning Shingle Starter Strip - 6 5/8" f you have any questions, please e-mail Eric Belaj at: ebelaj@cityofburnet.com. Drip Edge approx. 920' but as needed Owens Corning Duration Storm quantity as needed 350' Ridge cap shingle (Hip & Ridge) 3 Pipe Flashing - 1"-1/4"-3" 220' of Owens Corning VentSure Rigid Strip - 11 3/4" 230' of Valley Metal and Pipe Jacket Flashing as needed City Permits (Obtain permit but no fee will be paid) 2-3 R&R gravity roof ventilator Site clean-up In addition to the above the roofer contractor is to install all other associated components that are standard with roof replacement. The new roof should be no less than a 30-yr warranty type. A bid security of 5% of the bid amount must accompany each bid or proposal. A certified check or bank draft payable to the City of Burnet may be submitted in lieu of the Bid Bond. All work bid will be totally completed within 40 calendar days.

33 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.