Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2023

November 9, 2023

No Information to Display

3445 Post Rd

Renovation

No Information to Display

$885,000.00

Public - State/Provincial

img_map_placeholder

3445 Post Rd, Warwick, RI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

SCOPE OF WORK AND REQUIREMENTS WORK TO BE ACCOMPLISHED: Replace roof: 1. Remove existing EPDM roof system to steel deck. Also includes removing/disposing of non-operating roof equipment with associated pitch pockets and exterior ductwork. Patch roof deck and wall ductwork holes with metal. 2. Provide fully tapered lsocyanurate insulation (5.5" minimum, 1 /4" slope, 20psi), , mechanically fastened with corrosion resistant screws and galvanized plates, directly to the entire metal deck substrate.. 3. Provide a 60mil black non-reinforced EPDM fully adhered roof system with a manufacturer's 15-year warranty. 4. Provide new EPDM membrane flashing. Flash all penetrations, HVAC curbs, vent curbs, and drains to EPDM manufacturers latest written specs. 5. Provide new .040 Kynar aluminum gravel stops, scuppers and collector boxes where they exist (in any 2-coat standard color). Includes short extensions into existing downspouts if necessary. 6. replaced fascia and soffit with new Azek composite 7. Install new edge metal to the outside perimeter of the roof. Install new gutter system with new (7" commercial) seamless aluminum gutters, downspouts, and accessories. 8. Replace sleepers at AC units and associated piping. 9. any test holes and patching will be done by contractor.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.