Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 5, 2023

December 4, 2023

August 20, 2024

To Be Determined

Renovation

No Information to Display

$15,932,857.00

Public - County

img_map_placeholder

To Be Determined, Ventura, CA

Subscribe to View Full Documents

Construction of a 4.2-acre site involving development of a realistic roadway system and supporting infrastructure to accommodate fire and search & rescue training. There will be construction of a 5,431 GSF Class A Burn Building to simulate live fires in a residential setting; construction of a 12,346 GSF Class B Multi-Purpose building utilizing propane fired props to simulate training in apartment, commercial, and storefront type settings; and modifications to an existing structure to support ladder training. Construction for these buildings shall consist of conventional masonry and concrete with special mixtures designed to mitigate water infiltration and resist heat. The Class A burn building includes Multiple "Class A" Burn Rooms; Adjustable Mazes; Residential Garage Fire; Multi-Pitch Roof Ventilation; Ability to Control Light & Smoke; and Forced Entry. The Class B Building includes Center Hallways, Garden Style Apartment Circulation; Interior & Exterior Stairways; Small & Large Search & Rescue Rooms; Balconies; Forced Entry; Flat Roof; Pitched Roof; Simulated Power Poles; Curb Lines; Sprinkler System Props/Lab; Fire Alarm Simulation and Parapet Walls. The building is equipped with an integrated sound system capable of producing controlled sound effects in various spaces. Questions Due Date: Never The estimated cost of construction is $16,300,000.00. the Contractor will be required to furnish a Performance Bond and a Payment Bond, each in the amount of 100% of the contract price. Each bid must be accompanied by a bid guarantee in the amount of not less than 10% of the amount bid. COMPLETION TIME IS 260 WORKING DAYS

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.