Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 5, 2023

November 6, 2023

August 9, 2024

139 Hancock Rd

Renovation

No Information to Display

$461,371.00

Public - County

img_map_placeholder

139 Hancock Rd, North Wales, PA

Subscribe to View Full Documents

Door Hardware Replacement. The Work of the project consists of the complete removal and replacement of the door hardware throughout Gwyn Nor Elementary School. The general scope of the work includes the removal of existing door hardware; removal and replacement of doors and frames as indicated on drawings; and installation of new door hardware and accessories. Reference specifications and drawings for the locations and requirements. E-mailed questions should be directed to: SCHRADERGROUP architecture LLC, Attn: Devin Bradbury at dbradbury@sgarc.com

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.