Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

December 25, 2023

March 18, 2024

Multiple Locations

Site Work

No Information to Display

$3,100,000.00

Public - City

img_map_placeholder

Multiple Locations, Chowchilla, CA

Subscribe to View Full Documents

Contract Time shall be sixty (60) calendar days, and liquidated damages for delay shall accrue. See Agreement Between Owner and Contractor for more information. Inquiries regarding this project should be directed to the Engineer no later than Thursday, October 5th, 2023 at: spencer.supinger@qkinc.com. Scope of work includes, but it not limited to, installation of storm drain piping, manholes, drain inlets, underground storm drain chamber system, hydraulic separator, landscape and irrigation, and other items as shown on the plans and specifications. Contractor promises and agrees, at its own cost and expense, to furnish to the Owner all labor, materials, tools, equipment, services, and incidental and customary work necessary to complete the Project including all structures and facilities fully and adequately necessary for the Project or described in the Contract (hereinafter the Work or Project), for a Total Contract Price as specified pursuant to this Contract. All Work shall be subject to, and performed in accordance with the above referenced documents, as well as the exhibits attached hereto and incorporated herein by reference. The plans and specifications for the Work are further described in the Exhibits attached hereto and incorporated herein by this reference. Special conditions, if any, relating to the Work are described in the Exhibits attached hereto and incorporated herein by this reference. Scope of work includes, but it not limited to, installation of storm drain piping, manholes, drain inlets, underground storm drain chamber system, hydraulic separator, landscape and irrigation, and other items as shown on the plans and specifications. 2.6. PROJECT: A. Install a minimum of six thousand six hundred (6,600) linear feet of storm drain, a minimum of twenty (20 manholes/junctions, and a minimum of six (6) catch basin inlets. B. Install a minimum of one (1) diversion structure with a minimum design flow rate of six (6) cubic feet per second. C. Install a minimum of on (1) hydrodynamic separator with a minimum design flow rate of six (6) cubic feet per second. D. Install a minimum of one (1) subsurface infiltration gallery with a minimum design storage capacity of sixty-one thousand (61,000) cubic feet. E. Install a minimum of five hundred (500) square feet of rain gardens. F. Install a minimum of seven (7) trees and restore a minimum of twenty thousand (20,000) square feet of park turf

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects