Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 12, 2023

October 12, 2023

June 1, 2024

N Coast Inland Trail

Paving, Site Work

No Information to Display

$112,163.00

Public - City

img_map_placeholder

N Coast Inland Trail, Fremont, OH

Subscribe to View Full Documents

All questions during bidding should be addressed to Sameer Asadullah, P.E., who can be reached at 330-414-7537. North Coast Inland Trail Extension - Multi Use Path. Base bid: The project consists of constructing 1,300 linear feet of new multi-use asphalt paved path between the existing terminus of the North Coast Inland Trail into downtown Genoa as shown on the construction drawings. B. Alternate Bid: Trailhead amenities including Bicycle Rack, Bicycle Repair Station, Drinking Fountain & Water Bottle Filling Station. The completion date shall be changed to June 1, 2024

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects