Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

November 20, 2023

December 19, 2023

182 Buffalo St

Renovation

No Information to Display

$50,000.00

Public - State/Provincial

img_map_placeholder

182 Buffalo St, Canandaigua, NY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 1200 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Site must be cleaned, and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of project, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with the project manager. prevailing wages must be paid Contract term: 30 days after completion of project Questions deadline: 9/21/23 Contractors are encouraged to ask questions regarding the specifications of this project at the site visit. Any questions not asked at the site visit must be submitted in writing to FL.Purchasing@opwdd.ny.gov within 2 business of the site visit. Contractors will receive a response within 2 business days after the deadline for submitting questions. All questions and answers will be e-mailed to all contractors that attended the mandatory site visit. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 1200 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Site must be cleaned, and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of project, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with the project manager.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.