Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 19, 2024

March 19, 2024

September 11, 2024

630 Chapparal Cir

Paving, Site Work

No Information to Display

$4,939,316.00

Public - City

img_map_placeholder

630 Chapparal Cir, Napa, CA

Subscribe to View Full Documents

The Milliken Raw Water Pipeline consists of approximately 6,500 LF of 16" welded steel pipe, most of which is above ground and supported by redwood saddles. The pipeline runs adjacent to Milliken Creek on an unpaved trail with steep grades on either side, roughly half its length accessible by foot or ATV sized vehicles only. It is used to convey raw, untreated water from a diversion dam to the Milliken Water Treatment Plant. The Atlas Fire in 2017 damaged the pipeline (since repaired) and damaged the trail, including a 263-ft wooden ATV access way. The goal of the Project is to repair the damages to the trail (primarily retaining walls) and replace the ATV access way with a 263-ft steel ATV access way, while also replacing the 348 feet of existing pipeline beside it. The project also includes installation of a 39-ft steel bridge and a 75-ft steel walkway. Portions of this project are FEMA-funded, as indicated on the Bid Schedule. The Project must be fully completed within 126 working days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about January 9, 2024, but the anticipated start date is provided solely for convenience and is neither certain nor binding.

36 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.