Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 22, 2023

January 16, 2024

April 15, 2024

US-13

Site Work

No Information to Display

$588,588.00

Public - City

img_map_placeholder

US-13, Dover, DE

Subscribe to View Full Documents

US 13 East Pump Station (Station #7) Repairs. This work is detailed in the US 13 East Pump Station (Station #7) Repairs, Bid No.: 24-0004WW. The scope of work includes all necessary labor, equipment, and material to install 1 - 16"x12" wet tap and valve, 1 - 16" insertion valve, 1 - 16" pipe cap, approximately forty (40)+- of flowable fill for pipe section to be abandoned in-place, 1 emergency pump connection, 96 square feet of 6" concrete flatwork, wet well lining and restoration, and site restoration. LATE SUBMISSIONS: A bid received after the closing date and time for receipt of the bids is late and shall not be considered. It is the responsibility of the submitter to ensure that the bid is received prior to the closing date and time. The City of Dover reserves the right to request corrections, clarifications, and/or additional information pertaining to the bidder's response. The City of Dover reserves the right to waive technicalities, to reject any or all submissions, or any portion thereof, to advertise for new bids, to proceed to do the work otherwise, or to abandon the work, if in the best interest of the City. A bid bond or certified check in the amount equivalent to ten percent (10%) of the proposal amount shall be required with each proposal. Acceptable bid security shall be limited to a bid bond in a form satisfactory to the City underwritten by a company licensed to issue bid bonds in this state or a bank certified check. If a bid does not comply with security requirements, it shall be rejected as being non-responsive. The check or bid bond of the bidder to whom the contract is awarded will be forfeited to the City of Dover as liquidated damages in case the contract and performance bond are not executed within fifteen days after receiving official notification of award. A performance bond shall be required from the successful bidder for a construction contract. Such a bond shall be for the full amount of the contract. If the contractor fails to provide such a bond or a binder within fifteen days of the award of the contract, the award of the contract or the contract shall be void. The bond shall be released by the City of Dover upon successful completion of the contract and upon a detailed inspection of the contracted work.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.