Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 6, 2023

October 6, 2023

December 15, 2023

S Oak St

Paving, Site Work

No Information to Display

$97,452.00

Public - City

img_map_placeholder

S Oak St, Platteville, WI

Subscribe to View Full Documents

The Project consists of in- stalling HMA pavement on the alley located between Oak Street and Fourth Street. This Project also con- sists of repaving portions of the Platteville Business Incubator's parking lot as well as miscellaneous park- ing lot repairs. Bids shall be on a unit price basis, with additive alternate bid items as indicated in the Bid Form. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least five percent (5%) of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the Bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the Bidder as soon as the contract is signed. If after 15 days the Bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. BIDDER is required to deliver the original certified check or bid bond within 72 hours of bid opening to Delta 3 Engineering, Inc., Attn: Dan Dreessens, 875 S. Chestnut Street, Platteville, Wisconsin 53818. Bids may not be withdrawn within 90 days after the date of the bid opening. The OWNER reserves the right to increase or decrease the quantity of any item or portion of the work, or to omit portions of the work, as may be deemed necessary by the OWNER, and the same shall in no way affect or make void the contract, except those additions to, or deductions from, the contract price will be appropriately made. The OWNER reserves the right to waive any informalities Document notes: Bidding Documents may be obtained online using ebid doc #8648063 upon receipt of a non-refundable deposit of $40.00. Bidding Documents may also be examined at the office of the City of Platteville, at 75 N. Bonson Street, Platteville, Wisconsin 53818, on Mondays through Fridays between the hours of 8:00 a.m. and 4:30 p.m. CST. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Contractor shall furnish a performance bond and a payment bond, each in an amount at least equal to the Contract Price, as security for the faithful performance and payment of all of Contractors obligations under the Contract The Work will be substantially completed on or before November 17, 2023, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before December 15, 2023. The Work shall be continuous and uninterrupted.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects