Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2023

December 11, 2023

May 4, 2025

Multiple Locations

Renovation

No Information to Display

$2,300,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Texas City, TX

Subscribe to View Full Documents

Pump, Motor, & VFD for Water Treatment Plant; Piping for IPS; Install Pump & Motor for Water Treatment Plant & IPS. 26.8460.805.00.5758, 22W09010 3.1 Work at the Clearwell Pump Station (Facility 10) at the Thomas Mackey Water Treatment Plant includes: Furnish and install Clear Well Pump 552 and all appurtenances complete in place. Furnish and install all piping, appurtenances, and coatings to connect pump to distribution system, complete in place. Supply two (2) Variable Frequency Drives (VFDs). See "Variable Frequency Drives Supply Proposal for Clearwell Pump Station", included in Appendix C. Install two (2) VFDs with housekeeping pads and mounting, complete in place. Furnish, install and terminate all electrical instruments, conduit, and wiring to connect pumps and VFDs to the electrical system, complete in place. 3.2 Work at the Industrial Pump Station (Facility 20) includes: Transport four (4) Owner-Furnished pumps and motors from the Mackey Water Treatment Plant to Standard Alloys Incorporated (SAI). One (1) Owner-furnished pump is already stored at SAI. Transport five (5) Owner-Furnished pumps and motors from SAI to the Industrial Pump Station site. Install five (5) Owner-Furnished pumps and motors, complete with all appurtenances. Furnish and install all piping, piping modifications, appurtenances, and coatings. Conduct four (4) pump and motor inspections, stuffing box modifications, complete with all appurtenances. See "Pump and Motor Inspection Proposal for Industrial Pump Station", included in Appendix D. Furnish, install, and terminate all electrical conduit and wiring to connect pump motors to the electrical system. 3.3 Work at the IPS Screening Area (Facility 21) Furnish and install piping, fittings, valves, instruments, appurtenances, FRP plate, control panels, conduit, and wiring to connect screening area improvements to electrical system, complete in place. Question Deadline 09/12/2023 at 5:00 PM CT Construct the Work in phases during the construction period; coordinate construction schedule and operations with the Authority. B. For Clearwell Pump Station, see Drawing 10-X101 for Demolition notes and Drawing 10-W501 for sequence of pump installation. See Drawing 10-E101 for VFD Installation Sequence. C. For Industrial Pump Station, see Drawings 20-I100 through 20-I105 for phasing. D. For CPS Motorized Valve (Bid Alternate), see Drawing 11-P101 for requirements. For all questions, legal, purchasing, technical and schedule please contact: Name: John Martinez Title: Project Manager Phone: 409-682-0869 Email: jmartinez@gcwatx.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

74 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details