Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 8, 2023

June 21, 2024

December 31, 2024

Multiple Locations

Renovation

No Information to Display

$5,000,000.00

Public - Federal

img_map_placeholder

Multiple Locations, Moose Factory, ON

Subscribe to View Full Documents

Moose Cree First Nation is requesting proposals for the supply of a four train conventional treatment system with granular activated carbon filters for a new water treatment plant in the community. Generally, the works are to include: 1.shop drawings 2.conventional treatment and granular activated carbon system assembly 3.chemical feed system 4.monitoring and control instrumentation 5.SCADA system 6.O&M manuals 7.start-up, commissioning, and training. The scope of work includes the preparation of shop drawings, design, fabrication, supply, delivery, inspection of installed equipment, start-up, commissioning, operations and maintenance manuals, operator training, and acceptance testing. The scope of this section consists of the supply of all labour, materials, consumables and equipment necessary for the control and monitoring of the treatment system and water treatment plant. Include everything requisite and necessary to properly operate entire facility, notwithstanding that every item may not be specifically mentioned. Provide a control system to control raw water pumps, filter effluent pumps, water treatment process, chemical feed processes, water treatment plant, and treated water distribution pumps, including all alarm functions and metering and monitoring of various treatment streams. A genset will be provided (by General Contractor) to operate all equipment in the water treatment plant. Below is a partial listing of equipment (supply by others) to be controlled and monitored: .1 Control system for building heat and ventilation. .2 Ultra-violet disinfection units. .3 Intrusion alarm. .4 CCTV security system. .5 Actuated valves. .6 Raw water pumps. .7 Distribution pumps. .8 Wastewater systems. .9 Chlorine gas dosing system and associated monitoring instruments. Official bid documents must be obtained from www.merx.com . Bid value is undisclosed.

37 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.