Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 6, 2023

September 13, 2023

November 1, 2023

302 N Chicago St

Paving, Site Work

No Information to Display

$200,690.00

Public - County

img_map_placeholder

302 N Chicago St, Joliet, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Replacement of asphalt paving for the main parking lot at County Office Building Should you have any questions regarding this proposal, you must submit electronically to klynn@willcountyillinois.com. Mill and Resurface (approximate 101,120 sq ft) Lot and Driveway, both with a 2.0" surface course. o Mill asphalt area 2.0" and legally dispose of grindings at an authorized dump site. o Remove and later re-pin 75 existing park bumpers. o Provide power sweeper and vacuum truck to ensure clean area for asphalt work. o Prime area with SS-1 emulsion liquid asphalt primer (or approved equal). o Install 2.5" of hot bituminous asphalt surface mix and compact to 2.0". Storm Drain Adjustment o Re-mortar 17 parking lot drains as needed. o Adjust elevations of drainage structures as necessary as to provide for proper drainage. o Saw cut and/or air hammer asphalt around storm drain and perform full depth removal of asphalt. o Saw cut and remove surface area a minimum of 4' square around each sewer, 16 s.f. o Inspect and adjust as necessary with new "O" rings and/or blocks. Reinstall casting to meet existing or proposed new grade after paving. o Construct 16 s.f. concrete surround with minimum 6" of stone aggregate base and 4" of reinforced concrete. Curb and Gutter Repair or Replacement o Repair or replace damaged concrete curb and gutter approximately 50 Linear feet (marked in red) Striping o Re-stripe lot according to current configuration using yellow paint. o Material used must meet OSHA, ADA, and Illinois State Specifications. o Must advise the type of application the material will be applied.Begin Work: Work can commence after Wednesday, September 13, 2023. Subject to rain, once work begins it shall continue daily until project completion. Completion Deadline: Wednesday, November 1, 2023.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.