Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

November 13, 2023

June 30, 2024

148 Assiniboine Ave

Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

148 Assiniboine Ave, Harlem, MT

Subscribe to View Full Documents

The work shall consist of construction of the addition and remodel of the existing Little River Trading post gas station/convenience store. Work will include the removal and replacement of four underground single walled steel tanks (UST) and associated equipment (System), completion of a tank removal site assessment in association with that work, backfill of the former tank excavation area, the final design, procurement and installation of a new UST System according to the specifications in this document. This solicitation is subject to the Indian Preference procedures set forth in 24 CFR 1000.52; and, generally, the provisions of 2 CFR 200 Methods of Procurement; and the Fort Belknap Tribal Employment Rights Ordinance (TERO). Contractors must obtain a business license and employee registration from the Fort Belknap Tribal Employment Office (TERO) by contacting Nancy Boushie at (406)353-8454 or nboushie@ftbelknap.org. LITTLE RIVER TRADING POST FUEL SYSTEM REMOVAL AND REPLACEMENT. The OWNER reserves the right to reject any and all Bids, waive any informalities in Bidding or to accept the Bid or Bids which best serves the interests of the Island Mountain Development Group. No Bid shall be withdrawn for a period of 90-days after the scheduled opening without the consent of the OWNER.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects