Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2023

November 2, 2023

November 1, 2024

Multiple Locations

Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

Multiple Locations, Albany, NY

Subscribe to View Full Documents

Reference Number 0000328413 The project includes providing all labor, materials, machinery, tools, equipment, and other means of construction to install one (1) actuated stainless steel slide gate within the existing Big "C" Regulator Structure and two (2) stailess steel flap gates within the Beaver Creek Outfall are to the Hudson River and three (3) flow monitoring systems within existing combined sewer manhole structures at Arch Street, Green Street and Rensselaer Street. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Each bid must be accompanied by a bid security in the amount of five percent of the base bid in accordance with the Instructions to Bidders. The successful Bidder will be required to furnish construction performance and payment bonds in the full amount of the contract price Question Acceptance Deadline 09/22/2023 5:00 PM EDT Questions are submitted online No -- Questions pertaining to the bid package should be directed to Seth Watson, P.E. of CHA Consulting, Inc. at swatson@chacompanies.com. The Work isto be substantially completed on or before September 27, 2024, and completed and ready for final payment on or before November 1, 2024 This contract has an overall DBE subcontractor participation goal of 20%.

42 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.