Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 15, 2023

October 16, 2023

December 29, 2023

2450 Line 9

Site Work

No Information to Display

$1,000,000.00

Public - County

img_map_placeholder

2450 Line 9, Bradford West Gwillimbury, ON

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The project is located within Scanlon Creek Conservation Area, upstream of the Metrolinx rail crossing, and involves 2 specific project locations. This creek runs through both forested and open natural areas, and is located within the Conservation Authority's Regulated areas and the Regional Storm floodplain. The key project objectives are a culvert replacement, watercourse restoration and trail maintenance on Scanlon Creek. Specifically, the two (2) areas that are to be addressed include (A) a failing culvert creek crossing which has become a fish barrier located directly downstream of the previously completed restoration works, and (B) an area of severe bank erosion directly upstream of the original reservoir, including the removal of two (2) pedestrian bridges. This project also includes creating a trail bypass feature and some trail maintenance along approximately 50 metres of pre-existing trail. The intention is that this trail will be the predetermined construction access route for Site B. As the project is within the Regional Storm floodplain, and Site A is located directly upstream of a Metrolinx rail crossing, an as-built geodetic topographic survey will be required following the completion of construction to confirm the project maintains overland conveyance, and that the existing overland flow paths are not impacted by the proposed cut/fill locations. Documents may be obtained at https://lsrca.bidsandtenders.ca/ Question Deadline: Tue Sep 5, 2023 4:30 PM (EDT)

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects