Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 14, 2023

December 11, 2023

August 23, 2024

To Be Determined

Paving, Site Work

No Information to Display

$1,156,475.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Blanchard, PA

28

12

14

7

Subscribe to View Full Documents

This is a Partial Design Build Roadway Project. Design Activities Are Limited to: Concrete Curb Ramps. For the Curb and Sidewalk, Asphalt Paving, Concrete Paving, Drainage, Signs, and Other Miscellaneous Construction, All Within a Length of 2,734.36 Linear Feet (0.52 Miles) as Indicated on the Approved Drawings Included in the Bid Package for Critical Sidewalk Gaps, in Allegheny County, City of Pittsburgh, Commonwealth of Pennsylvania. This Project Being Situated as Follows: Fountain Street: From the Intersection With Henderson Street (Station 10+06) to the Intersection With Compromise Street (Station 27+33). Thornton Street: From the Intersection With Surban Street (Station 29+70) to the Intersection With Ashlyn Street (Station 32+71). Broad Street/east Liberty Boulevard: From a Point Approximately 290 Feet West of the Intersection With Enright Court (Station 39+75) to a Point Approximately 239 Feet to the North of the Intersection With Frankstown Avenue (Station 63+25). Project Cost Range: $500,000.00 - $999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 17.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes Prequalified Subs as Prime: No State Type of Work: Widening/resurfacing (No Additional Lanes) Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - RFP D/B - Design Activities Are Limited to: Concrete Curb Ramps *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects