Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 5, 2023

October 5, 2023

No Information to Display

Multiple Locations

Renovation

No Information to Display

$780,000.00

Public - County

img_map_placeholder

Multiple Locations, Spring, TX

Our team is requesting plans for this project.

Subscribe to View Full Documents

Lift Station No. 1 The work includes but is not limited to the demolition and removal of existing T-Lock liner; the application of one-inch (1") of concrete repair mortar to all areas of the wet well walls and underside of top slab; application of a 100% solids epoxy coating system to the wet well walls and underside of top slab; blasting and recoating of all above ground piping and valves; demolition and replacement of all wet well piping, fittings, and supports, including protective coatings; demolition and replacement of all pump guide rails and support brackets; bypass pumping system during the entire duration of work; site restoration; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station. Supplemental Item - Demolish and replace the existing above ground piping and valves, complete with the application of protective coatings. Lift Station No. 2 The work includes but is not limited to the blasting and recoating the wet well walls and underside of top slab; the application of one-inch (1") of concrete repair mortar to all areas of the wet well walls and underside of top slab; application of a 100% solids epoxy coating system to the wet well walls and underside of top slab; slab; blasting and recoating of all above ground piping and valves; demolition and replacement of all above ground piping and valves, including protective coatings; demolition and replacement of all wet well piping, fittings, and supports, including protective coatings; demolition and replacement of all pump guide rails and support brackets; installation of precast steps at the main service disconnect; bypass pumping system during the entire duration of work; site restoration; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station. Supplemental Item - Demolish and replace the existing above ground piping and valves, complete with the application of protective coatings. On-Site WWTP Lift Station The work includes but is not limited to demolition and removal of existing T-Lock liner; the application of one-inch (1") of concrete repair mortar to all areas of the wet well walls and underside of top slab; application of a 100% solids epoxy coating system to the wet well walls and underside of top slab; blasting and recoating of all above ground piping and valves; demolition and replacement of all wet well piping, fittings, and supports, including protective coatings; demolition and replacement of all pump guide rails and support brackets; bypass pumping system during the entire duration of work; miscellaneous conduit modifications; site restoration; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.