Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2023

October 19, 2023

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Clarksburg, WV

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Project includes the following Work: Purchase of one (1) valve maintenance trailer as described more fully in the technical specifications. Bids are requested for the following Contract: Phase 3A - Clarksburg Water Board Lead Service Replacement and System Upgrade Project, Valve Maintenance Trailer (Vendor Bid). The Vendor Contract will be substantially completed within 90 calendar days after the date when the Contract Times commence to run, and completed and ready for final payment within 120 days after the date when the Contract Times commence to run. Liquidated damages shall be $100 per day. Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. The Issuing Office for the Bidding Documents is: The Thrasher Group, Inc. 600 White Oaks Boulevard Bridgeport, WV 26330 A two envelope system will be used. Envelope No. 1 must have the following information presented on the front: Name and address of Bidder Bid on Contract - Phase 3A - Clarksburg Water Board Lead Service Replacement and System Upgrade Project, Valve Maintenance Trailer (Vendor Bid) Received by the Clarksburg Water Board Envelope No. 2 labeled "Bid Proposal" shall also be placed inside of Envelope #1. Envelope No. 1 will be opened first and the Bid Opening Requirement items checked for compliance as outlined on the Bid Opening Checklist on page BOR - 1 of these contract documents. If such documents are found to be in order, Envelope No. 2 "Bid Proposal", will then be opened and will be publicly read aloud. If the documents required to be contained in Envelope No. 1 are not in order, Envelope No. 2 "Bid Proposal" will not be opened and the Bid will be considered non-responsive and will be returned to the Bidder. A bidder may not withdraw his bid for a period of ninety (90) days after the date set for the opening of bids. Bids shall be accompanied by a certified check or bid bond payable to Clarksburg Water Board in an amount equal to five percent (5%) of the base bid. "DBE REQUIREMENTS" Each Bidder must fully comply with the requirements, terms, and conditions as set forth in the contract documents to achieve Disadvantaged Business Enterprise (DBE) participation during the performance of this contract. The bidder commits itself to the program for DBE participation and all other requirements, terms, and conditions of the bid conditions by submitting a properly signed bid. The bidder agrees to make "good faith efforts" to sub-contract a portion of the total value of the contract to disadvantaged businesses. This shall be done in compliance with the six (6) affirmative steps as outlined in 40 CFR 31.36(e). Failure to demonstrate positive efforts to do so may lead to rejection of bids. For the purpose of this program, the term "subcontractor" includes all construction, modification, and service work contracted for by the bidder in the execution of the work under this contract. Nondiscrimination in Employment - Bidders on this work will be required to comply with the President's Executive Order Number 11246 and the provisions of Executive Order No. 10925 as included therein. The requirements for bidders and contractors under this order are explained in the specifications. American Iron and Steel Requirement - P.L. 113-76 Consolidated Appropriations Act, 2014 (ACT), includes an "American Iron and Steel" (AIS) requirement in section 436 that requires Clean Water State Revolving Loan Fund (CWSRF) and Drinking Water Revolving Loan Fund (DWSRF) assistance recipients to use iron and steel products that are produced in the United States for projects for the construction, alteration, maintenance, or repair of a public water system or treatment works. Drug Free Workplace - West Virginia Code 21-1D-5 providesthat any solicitation for a public improvement construction contract requires each vendor that submits a bid for the work to submit at the same time an affidavit of compliance with the bid. The enclosed drug-free workplace affidavit must be signed and submitted in the first envelope as evidence of the vendor's compliance with the provisions of Article 1D, Chapter 21 of the West Virginia code. Failure to submit the signed drug-free workplace affidavit in the first envelope shall result in disqualification of such bid. Pre-bid Conference There will not be a pre-bid conference for this project. Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects