Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
September 6, 2024
No Information to Display
To Be Determined
New Construction, Paving, Site Work
No Information to Display
$175,000.00
Public - State/Provincial
To Be Determined, Half Moon Bay, CA
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
The project requires professional engineering services to evaluate proposed new trail, rerouted trail, and road to trail alignments based on underlying geologic conditions. The project may need permits from agencies, including but not limited to, San Mateo County Planning and Building Departments including a Coastal Development Permit, County Department of Public Works Encroachment Permit, California Department of Fish & Wildlife, Regional Water Quality Control Board, and United States Army Corps of Engineers. The District will prepare any necessary regulatory agency permits and pay any associated fees. The District's trail construction crew completed layout of the preliminary trail alignments based on observable conditions, including landform observations, known sensitive species populations, and proximity to jurisdictional areas such as streams, wetlands, and riparian habitats. The preliminary alignment totals seven miles incorporation approximately 2.8 miles of existing routes and 4.4 miles of proposed new trail construction, at least two (2) trail bridges will be required, and multiple 16'-20' span puncheons (District standard detail). The trail will also likely require other drainage crossing solutions, minor retaining walls (District standard detail <30" high), and rocked sections of trail tread. A segment of trail along Verde Road is within the San Mateo County Right-of-way and will require an encroachment permit with San Mateo County Department of Public Works. Additionally the project may incorporate some road removal/abandonment to serve as mitigation for project related impacts to natural resources. The District's trail construction crew will build the trail and structures (i.e. trail bridges, retaining walls, etc.) based on the final design. The consultant shall provide a letter report summarizing existing conditions and engineering geology recommendations. The consultant shall provide design and engineering services including an evaluation of the proposed trail alignments and improvements from a geological perspective, preparation of plans suitable to permit the project through San Mateo County Planning and Building Departments, and engineering services during construction as necessary during implementation by the District's trail construction crew. The District will use the design plans and associated calculations, with support from the consultant, to apply for and receive building permits from San Mateo County for any trail structures required. The District will use the 60% design plan (Task 1c) to apply for any required regulatory permits. The deadline to submit questions is August 31, 2023 at 5:00pm. Please submit all requests to: Bryan Apple, Capital Projects Field Manager bapple@openspace.org Midpeninsula Regional Open Space District 5050 El Camino Real Los Altos, CA 94022 The method of Contractor Selection has not been Determined at this time
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Half Moon Bay, CA
Bid Date: May 25 2023
Half Moon Bay, CA
Bid Date: Oct 26 2023
Half Moon Bay, CA
Bid Date: Oct 26 2023
Half Moon Bay, CA
Bid Date: Nov 17 2023
Half Moon Bay, CA
Bid Date: Oct 01 2024
Half Moon Bay, CA
Bid Date: Sep 14 2023
Half Moon Bay, CA
Bid Date: Jul 25 2023
Half Moon Bay, CA
Bid Date: Aug 24 2023
Half Moon Bay, CA
--
Half Moon Bay, CA
Bid Date: Sep 13 2023
Dublin, CA
Bid Date: Jul 24 2023
Sacramento, CA
Bid Date: Aug 17 2023
Oakland, CA
Bid Date: Aug 31 2023
San Diego, CA
Bid Date: Aug 17 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
