Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 23, 2023

September 22, 2023

No Information to Display

To Be Determined

Site Work

No Information to Display

$100,000.00

Public - City

img_map_placeholder

To Be Determined, Lemoore, CA

Our team is requesting plans for this project.

Subscribe to View Full Documents

Any questions regarding this project during the bidding phase shall be directed to the Project Engineer, Mr. Randon Reeder or Frank Rivera at rreeder@lemoore.com. Questions are due no later than 7-days prior to bid opening Time of completion for the work shall be thirty (45) calendar days from (a) the date of commencement of the work as established in the Citys Notice to Proceed, or (b) if no other date is established in a Notice to Proceed from City, the date of Contractors actual commencement of the Work (including mobilization). A certified check, cashiers check, or bidder's bond in the amount of ten percent (10%) of the bid made payable to the City of Lemoore will be required to accompany each bid. If a bid bond is used, it must be issued by an Admitted Surety (an insurance organization authorized by the Insurance Commissioner to transact surety insurance in the State of California during this calendar year), which shall be given as a guarantee that the bidder will enter into a Contract if awarded the Work and will be declared forfeited, paid to, or retained by the City as liquidated damages if the bidder refuses or neglects to enter into the Contract provided by the City after being requested to do so. Pursuant to the Contract Documents, the successful bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the Contract Sum, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the Contract Sum. City reserves the right to approve or reject the surety insurer selected by Contractor and to require Contractor to obtain a bond from a surety insurer satisfactory to the City The Disadvantage Business Enterprise (DBE) Contract goal is 8%.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.