Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 12, 2023

October 5, 2023

March 31, 2024

Kierland Rd & Marta Cres

Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

Kierland Rd & Marta Cres, Barrie, ON

Subscribe to View Full Documents

The Work under this contract include the installation of a coffer dam and dewatering of the residential properties along Marta Crescent. Provisional work will include residential properties along Marta Crescent and Kierland Road, within the City of Barrie. Access will be gained off Summerset Drive and Kierland Road, which should be repaired to pre-disturbed conditions or better upon completion of the Work. The Work consists of installation of a watertight sand bag coffer dam, temporary dewatering, removal of the coffer dam and flow management equipment, and restoration of the disturbed areas, including restoration of disturbed fencing, slopes, access and staging areas. The site is entirely within a wetland with varying levels of standing water. It is required that the coffer dam maintains a minimum freeboard height of 0.2 m above the standing water level. The depth/height of the dam will vary with depth and compaction to maintain the proposed 0.2 m freeboard. Sand bags will need to be manually installed or placed with the use of small, rubber tracked equipment, as to be determined at the discretion of the Contractor. Phase 1 of this project will constitute the base scope for this project, and is to include the defined backyard areas from 19 Marta Crescent to 37 Marta Crescent, inclusive. The provisional Phase 2 of this project is to include the defined backyard areas from 39 Marta Crescent to 57 Kierland Road, inclusive. Documents can be obtained at: https://barrie.bidsandtenders.ca Question Deadline: Tue Sep 5, 2023 2:00:00 PM (EDT)

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.