Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2023

October 19, 2023

April 19, 2024

Multiple Locations

Site Work

No Information to Display

$1,500,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Nampa, ID

Subscribe to View Full Documents

The project consists of the construction of new outlet structures at the hatchery settling pond, settling pond sludge removal, and pond modifications. Outlet structure installation includes fish screens, 4' x 4' box culvert crossing Powerline Road and a culvert junction structure discharging to Wilson drain and ponds. Sludge removal will be performed to remove accumulated fish waste and fine sediment. Settling pond earthwork will be performed to deepen the pond and to regrade the banks with the placement of riprap material to provide additional stability. Baffles will be installed within the pond to limit channelization, control velocities, and maintain water quality standards This bid security shall be given as guarantee that the Bidder will not withdraw his Proposal for a period of 60 days after bid opening, and that if awarded the Contract, the successful Bidder will execute the attached Contract and furnish the Performance Bond and Labor and Materials Payment Bond as hereinafter specified. The Bidder further agrees to begin work within 10 calendar days after the date shown on the Notice to Proceed and to complete the construction, in all respects, for which his Proposal is accepted within the number of calendar days after the date of execution of the Contract by the Owner as set forth below: 180 Calendar Days A bid bond in the amount of 5% of the bid is required if total bid is equal to or greater than $50,000. A Public Works Contractors License for the State of Idaho is required of the successful bidder at the time of bid opening if total bid is equal to or greater than $50,000. Include names and Public Works License number on Sub-Contractor List as part of bid. Include names and Public Works License number on Sub-Contractor List as part of bid if total project value is greater than $50,000.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.