Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2023

November 13, 2023

February 5, 2025

737 Albany Shaker Rd

Demolition, New Construction, Site Work

No Information to Display

$3,000,000.00

Public - County

img_map_placeholder

737 Albany Shaker Rd, Albany, NY

Subscribe to View Full Documents

https://www.bizjournals.com/albany/news/2023/10/11/albany-airport-construction-bid-terminal-expansion.html Two construction bids were submitted by contractors competing for largest phase of the $100 million terminal expansion at Albany International Airport. _____________________________________________________________________________________ Reference Number 0000327726 Terminal Expansion - Structural and Interior Terminal Expansion - Structural and Interior at Albany International Airport. In general, this project consists of, but not limited to, provide the following (1) curtain wall, storefront systems and interior glazing (2) sliding and vestibule doors (3) roofing (4) expansion joints (5) exterior and interior framing (6) metal wall panels (7) granite bases (8) removal of existing canopies (9) masonry and masonry repairs, (10) mechanical,electrical plumbing and fire alarm systems (11) audio visual systems, (12) security systems (13) maintenance and traffic protection (14) interior finishes (15) children's play area (16) children's sensory area (17) executive lounge (18) selective demolition (19) doors frames and hardware (20) solar panels (21) miscellaneous metals (22) millwork + casework (23) signage and wayfinding (24) specialties as part of the Terminal Expansion Project. T Question Acceptance Deadline 09/05/2023 12:00 PM EDT Questions are submitted online No The project includes a DBE goal of 4.73%. The participation goals that have been established for this Project are ten percent (10%) Minority and four (4%) for Woman (workforce goals).

81 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.